top of page
caution tape around asbestos abatement

Asbestos Abatement in Toronto and the GTA

StrongRise Builders provides asbestos abatement services across Toronto, Vaughan, Thornhill, Richmond Hill, and the GTA for homes and commercial properties where asbestos-containing materials have been identified or are suspected.

​

Asbestos is common in many older buildings and can be found in insulation, floor tiles, textured ceilings, pipe insulation, drywall compounds, plaster, and other building materials. The concern usually comes up during a renovation, after water or fire damage, or when older materials need to be removed.

 

Before disturbing a suspected material, we determine what needs to be tested and how the work should be handled. If asbestos is confirmed, the removal is planned according to the material, its condition, location, and the requirements that apply to the work.

Once the abatement is complete, we can also take care of the repairs or renovation that follows, so you are not left looking for another contractor to put the space back together.

WSIB coverage badge
StrongRise Builders 5 Million dollar liability insurance certification badge
iicrc ceritifed Firm badge
Asbestos Roof Removal

Asbestos Abatement

Asbestos-containing materials can be found in many older homes and buildings, including vermiculite insulation, textured ceilings, vinyl floor tiles, pipe insulation, plaster, drywall compounds, and other building materials. When a material is suspected of containing asbestos, it should be properly assessed before it is disturbed.

​

In Ontario, asbestos work is regulated under Ontario Regulation 278/05 and is classified as a Type 1, Type 2, or Type 3 operation depending on the material, its condition, and the work being performed.

​

When asbestos is confirmed, the required procedures are determined before removal begins. Depending on the classification, this can include containment, protective equipment, HEPA filtration, decontamination procedures, controlled removal, and proper handling and disposal of asbestos-containing waste.

​

Once the abatement is complete and the area is ready for reconstruction, StrongRise Builders can also manage the repairs and rebuilding required to put the space back together.

How We Handle Asbestos Abatement

Asbestos abatement starts with identifying the material and understanding what work needs to be done around it. If testing has not already been completed, sampling can be arranged before renovation or demolition begins.

​

In Ontario, asbestos work is regulated under Ontario Regulation 278/05 and is classified as a Type 1, Type 2, or Type 3 operation. The classification depends on the material, its condition, and how it will be disturbed or removed.

​

Depending on the type of operation, the work may require containment, protective equipment, HEPA filtration, decontamination procedures, controlled removal, and specific handling and disposal of asbestos-containing waste.

 

The goal is to remove the affected material without unnecessarily spreading asbestos fibres into other areas of the property. Once the abatement is complete and the area is ready for reconstruction, we can move ahead with the repairs or renovation.

asbestos abatement ppe containment vaughan

Asbestos Abatement Services

The type of asbestos work required can vary considerably depending on the material and where it is located. We can coordinate asbestos testing and abatement as part of a standalone project, renovation, or insurance restoration.

Asbestos Abatement

  • Asbestos testing coordination

  • Type 1, Type 2, and Type 3 asbestos operations

  • Vermiculite insulation removal

  • Textured and popcorn ceiling removal where asbestos is present

  • Asbestos-containing pipe insulation and duct wrap removal

  • Pipe insulation and other asbestos-containing insulation removal

  • Containment and HEPA filtration where required

  • Controlled removal and disposal of asbestos-containing materials

  • Clearance testing where required

  • Drywall, insulation, flooring, painting, and reconstruction after abatement

Reconstruction After Remediation

Once remediation is complete, we can also handle the work required to put the property back together, including drywall, insulation, flooring, trim, painting, cabinetry, and other damaged finishes.

​

For insurance-related losses, we can also provide project documentation and work with the insurer or adjuster throughout the remediation and reconstruction process.

One Team for Asbestos Abatement

A lot of asbestos abatement companies handle the removal and stop there. Once the asbestos-containing materials are removed and the area is cleared, you may still be left with missing drywall, insulation, flooring, ceilings, or other finishes that need to be replaced.

​

We handle both sides of the work. The same project manager can coordinate the asbestos abatement and then manage the repairs that follow, including drywall, insulation, flooring, trim, painting, cabinetry, and other affected finishes.

 

That means one point of contact, one schedule, and no need to find another contractor to put the space back together once the asbestos work is complete.

caution tape used during asbestos abatement

How Long Does an Asbestos Abatement Take?

Smaller asbestos abatement projects can often be completed in 1–3 days, while larger or more involved projects may take several days to a few weeks.

​

The timeline depends on the type and amount of asbestos-containing material, where it is located, whether the work is classified as a Type 1, Type 2, or Type 3 operation, and the containment and removal procedures required.

​

Testing and clearance requirements can also affect the schedule. If repairs or reconstruction are needed after the asbestos work is complete, we’ll provide a separate timeline for putting the affected areas back together.

How Much Does an Asbestos Abatement Cost in the GTA?

Asbestos abatement is priced based on what material is being removed, how much is present, where it is located, and how the work needs to be handled.

​

For example, removing asbestos-containing floor tile is very different from removing vermiculite insulation from an attic or pipe insulation from a mechanical room. Access, containment, disposal, testing, and whether the work falls under Type 1, Type 2, or Type 3 procedures can all affect the cost.

 

Because asbestos projects can vary so much from one property to another, we price the work after reviewing the affected area and any available testing. If testing has not been completed, we can help coordinate it before the work begins.

Need Asbestos Abatement in the GTA?

Schedule an on-site assessment with StrongRise Builders to review the affected area and the materials involved. We’ll look at the existing conditions, review any testing that has already been completed, and determine what additional testing or abatement work may be required.

​

Following the site assessment, we’ll provide a clear scope of work and detailed estimate for the asbestos abatement. If repairs are needed afterward, we can handle those as part of the same project.

Other Areas We Work In

We serve asbestos abatement and restoration clients throughout York Region and the GTA, including:

Toronto   North York   Vaughan   Thornhill   Richmond Hill   Markham   Concord   Maple   Woodbridge   Kleinburg   King City   Aurora   Newmarket   Stouffville   Etobicoke   Oakville

Frequently asked questions

bottom of page